Open letter: Coal train impacts need to be studied

Today at 5 p.m. is the end of the “scoping period” to submit written concerns about the proposal to run new coal trains through South Seattle near Beacon Hill from the Gateway Pacific Terminal at Cherry Point. Comments submitted in this scoping period will help in defining the impacts to be included in the project’s Environmental Impact Statement (EIS).

Neighbor Mira Latoszek wrote this commentary letter:

Dear Army Corps of Engineers, Department of Ecology and Whatcom County Council:

I am a resident of the North Beacon Hill neighborhood of south Seattle. I live directly to the east of the train tracks that would carry an increased number of trains to and from the Gateway Pacific Terminal at Cherry Point. Beacon Hill is a large Seattle neighborhood of approximately 40,000 people. I am asking that you study impacts associated with the increase of trains at crossings in south Seattle, specifically at Spokane St., Lander St. and Holgate St. These are major intersections connecting Beacon Hill to the Industrial District, the Port of Seattle, the waterfront, and downtown.

I, along with many of my neighbors on Beacon Hill, are dependent on goods and services from the SODO area which would be directly affected by the increase of trains at these crossings. In addition, many of us work in an around the SODO area and the southern end of downtown Seattle, including several owners of small businesses. I travel by car and bike through these intersections on a daily basis to get to my job on Second Avenue in Pioneer Square. Being able to get across the train tracks quickly and safely is an important part of my life.

According to the applicant’s Project Information Document (Feb. 2011), full build out of the coal export facility would result in nine full northbound trains along this line a day, which equates to 18 train trips a day; however, nothing in the project materials specifies a maximum. The 18 trains per day round trip could be increased if export capacity of the proposed port were expanded in the future. The current port proposal occupies 350 acres of a 1,000-acre site. Each train may be over 1.5 miles long, which at 50 miles per hour would mean approximately 3-4 minutes between train approach warning/gate closure and ultimate gate opening. At 35 miles per hour it could take approximately 6-7 minutes to clear a crossing as the siding near
this area is rated for 35 mph. The 18 trains per day would equate to approximately one additional coal train every 1.3 hours, all day long, in addition to existing train traffic. That would translate to an addition of approximately two hours per day that vehicles and people would not be able to cross these major intersections in south Seattle.

There is already a significant amount of train traffic at these intersections today. There have been numerous times when I have had to abandon planned shopping trips and stops in the area due to freight trains slowly moving through SODO. I have to factor in the time that it takes to cross the tracks in my daily commute to work as do many others in my neighborhood. An increase on top of already existing train traffic would severely affect the daily lives of myself and many others from Beacon Hill.

Looking at the broader picture, I am greatly concerned that the increased rail traffic in downtown Seattle and the port area will affect the flow of road traffic, port traffic and impact the Seattle waterfront. The costs in productivity due to the delays in traffic waiting to cross the tracks, delays in other port traffic and increased liability risk from potential fire, derailment, accidents and infrastructure damage cannot justify using our state’s most important port, commerce and tourism area as a transit point for moving massive coal supplies from another state to overseas markets.

In addition, there are potentially severe consequences for the Seattle’s transportation plan and improvements, with increases in risk of accidents, impacts to the City’s levels of service, ability to provide effective emergency response times, and possible interference with local freight delivery systems important to the City’s economic recovery.

Given the enormity of these impacts on a great number of people and on the economy of the State of Washington and the city of Seattle. I am asking that the proposal be denied and that the “no action” alternative be taken in regard to this project. If no action is taken on this proposed project, the applicant, SSA Marine, will still have the economic benefit of building the terminal permitted by Whatcom County in 1997.

Thank you,
Mira Latoszek
Beacon Hill

Information about the Cherry Point project and coal train impacts may be found at http://www.coaltrainfacts.org/. Comments about the project should go to comments@eisgatewaypacificwa.gov before 5 p.m. today.

2 thoughts on “Open letter: Coal train impacts need to be studied”

  1. To the originator:
    Railroads have the lowest environmental impact of any mode of freight moving. As far as safety is concerned, educate the careless drivers about railroad crossings. If you don’t like the noise, put up with it or MOVE! After all, the railroad was there first and YOU WERE AWARE of the railroad when you moved into your present domicile…goes for the rest of the people living close to any railroad. The railroads were there for probably 100 years or more before you and will be there many, many years after you.

Comments are closed.